How long does it take to get a private label vitamin C kojic acid serum made?

By Blake Mereby · Last reviewed October 4, 2026

The total timeline from first contact with a contract manufacturer to receiving saleable units of a private label vitamin C kojic acid body serum is typically 10–20 weeks, broken into distinct phases that each carry their own risks for delay.

Phase 1 is supplier selection and NDA/brief alignment, which takes 1–3 weeks. This is where most first-timers lose time — they approach multiple labs with vague briefs, wait for quotes that aren't apples-to-apples, and go back and forth on formulation scope. Coming in with a clear brief (target volume, actives concentration, packaging type, regulatory markets, and budget band) compresses this phase significantly. AJ Cosmo Labs was built to accelerate exactly this step by letting you post a single brief and receive responses from multiple vetted manufacturers simultaneously.

Phase 2 is formula development and bench samples, running 3–6 weeks for a semi-custom formulation. The cosmetic chemist builds the formula, checks pH stability (vitamin C and kojic acid both require a pH of roughly 3.0–3.5), and produces a small bench batch — often just 1–2 kg. You review and approve the bench sample, or request tweaks. Each revision cycle adds 1–2 weeks.

Phase 3 is accelerated stability testing, which takes a minimum of 4–12 weeks depending on protocol depth. A basic 4-week accelerated study at 40°C gives early confidence but isn't sufficient for most retail buyers or EU registration. A full 12-week accelerated run is the industry standard. Some labs run stability in parallel with other approval steps to save clock time.

Phase 4 is production fill, which typically takes 2–4 weeks once formula and packaging are locked. This includes procurement of components (actives, packaging), the actual fill run, quality control checks (pH, viscosity, microbial testing), and labeling.

Phase 5 is shipping and customs clearance, adding 1–2 weeks domestically or 3–5 weeks if manufacturing overseas.

The most common cause of timeline blowout is packaging. Custom packaging components — especially airless pumps in a non-stock color or size — often have their own 8–12 week lead time from the component supplier. If you haven't ordered packaging by the time bench samples are approved, you've just added 8 weeks to your go-live date. Order packaging early, even before you've fully finalized the formula, based on your expected fill volume and dimensions.

Ingredients in this answer: Kojic Acid

Read the full guide on Private Label Vitamin C Kojic Acid Body Serum Low MOQ →

More about Private Label Vitamin C Kojic Acid Body Serum Low MOQ

Tell us about your product

Tell us your product and quantities. Find vetted contract manufacturers and custom labs on AJ Cosmo Labs, with payments held in escrow. Starting is free.

Free to start · no credit card · continue in your browser or the iPhone app.

Have a product idea?

Connect with vetted cosmetic chemists and custom labs on AJ Cosmo Labs.

Get on the App Store Open the web app